Notice: Function amp_is_available was called incorrectly. `amp_is_available()` (or `amp_is_request()`, formerly `is_amp_endpoint()`) was called too early and so it will not work properly. WordPress is not currently doing any hook. Calling this function before the `wp` action means it will not have access to `WP_Query` and the queried object to determine if it is an AMP response, thus neither the `amp_skip_post()` filter nor the AMP enabled toggle will be considered. It appears the theme with slug `maisbrasilia` is responsible; please contact the author. Please see Debugging in WordPress for more information. (This message was added in version 2.0.0.) in /var/www/html/wp-includes/functions.php on line 6031
Nesta terça (12), modernização na rede interrompe energia no Recanto das Emas e Paranoá – Mais Brasília Warning: Undefined array key 0 in /var/www/html/wp-content/themes/maisbrasilia/functions.php on line 596 Deprecated: str_replace(): Passing null to parameter #3 ($subject) of type array|string is deprecated in /var/www/html/wp-content/themes/maisbrasilia/functions.php on line 596
Do Mais Brasília

Nesta terça (12), modernização na rede interrompe energia no Recanto das Emas e Paranoá

Desligamento programado nesta terça (12), em localidades das duas regiões administrativas, é necessário para evitar acidentes durante a realização de serviços como a manutenção da rede

Foto: Marcelo Camargo/Agência Brasil

Nesta terça-feira (12/7), localidades de duas regiões do Distrito Federal passarão por desligamento programado de energia: Recanto das Emas e Paranoá. O procedimento é necessário para evitar acidentes durante a realização de serviços como a modernização e a manutenção da rede.

No Recanto das Emas, das 8h30 às 16h, serão feitos serviços de modernização da rede nas seguintes áreas: Avenida Buriti, Quadra 203, Conjunto 7, Lote 10; Avenida Eucalipto, Quadra 204, conjuntos 3, 5 e 7; Avenida Recanto, Quadra 203, conjuntos 6 e 7, 9 ao 19, lotes 11, 15, 16, 19, 26 e 39, e Quadra 204, conjuntos 1, 3, 6 ao 23.

No Paranoá, serão realizadas ações de modernização da rede de média tensão, das 9h30 às 17h, nos seguintes locais: Condomínio Del Lago, Quadra 20, Lote 1; Quadra 33, Lote 26; Quadra 49, lotes 2, 16 ao 19, 21 ao 27 e 29; Quadra 50, lotes 42, 43, 100 e conjuntos A ao D; Quadra 50-A, lotes 5-A, 7, 8, 9-A, 9-B, 10 ao 14, 16 ao 18, 18-B, 19, 21 ao 30, 32 ao 41, 44, 45, 54, 55, 58, 59, 62 ao 68, 70, 72, 73, 76, 76/50, 77, 78, 83, 86 e 95; Quadra 50-B, lotes 2 e 3; Quadra 50-C, lotes 2 ao 5, 11 ao 13 e 13-A; Quadra 50-D, lotes 1, 3, 4 e 7 ao 12; Quadra 51, lotes 16 ao 29, 30, 31 ao 34 e 36 ao 44; Quadra 52, lotes 1, 2, 4 ao 24, 26 ao 34 e 36 ao 54; Quadra 53, lotes 3 ao 5, 7 ao 12, 12-A, 13 ao 20, 21, 22 ao 26, 29 ao 45, 48 e 50 ao 53; Quadra 54, lotes 1 ao 9, 11 ao 25, 26, 28, 29, 33, 34, 35, 37 ao 50, 52, 53 e 54; Quadra 55, lotes 6 e 21-B; Quadra 56, lotes 16, 19 e 21; Quadra 58, lotes 25, 34-B, 35 e 41; Quadra 59, Lote 18; Quadra 60, Lote 4-A; Quadra 61, Área Especial 8; Quadra 318, conjuntos M, N e O.

Caso os trabalhos sejam concluídos antes do previsto, a energia será religada sem aviso prévio.

Além dos desligamentos programados, pode acontecer de acabar a energia em alguma região, sem aviso prévio. Nesses casos, a população pode registrar a ocorrência pelo telefone 116.

 

Warning: Undefined variable $catCP in /var/www/html/wp-content/themes/maisbrasilia/footer.php on line 132 Warning: Trying to access array offset on value of type null in /var/www/html/wp-content/themes/maisbrasilia/footer.php on line 132 Warning: Attempt to read property "slug" on null in /var/www/html/wp-content/themes/maisbrasilia/footer.php on line 132