Notice: Function amp_is_available was called incorrectly. `amp_is_available()` (or `amp_is_request()`, formerly `is_amp_endpoint()`) was called too early and so it will not work properly. WordPress is not currently doing any hook. Calling this function before the `wp` action means it will not have access to `WP_Query` and the queried object to determine if it is an AMP response, thus neither the `amp_skip_post()` filter nor the AMP enabled toggle will be considered. It appears the theme with slug `maisbrasilia` is responsible; please contact the author. Please see Debugging in WordPress for more information. (This message was added in version 2.0.0.) in /var/www/html/wp-includes/functions.php on line 6031 Recapeamento asfáltico fecha alça de acesso à Samambaia no DF nesta terça (5) – Mais BrasíliaRecapeamento asfáltico fecha alça de acesso à Samambaia no DF nesta terça (5) – Mais Brasília

Recapeamento asfáltico fecha alça de acesso à Samambaia no DF nesta terça (5)

Interdição ocorrerá das 5h às 12h, no trecho da fábrica da Coca-Cola (Viaduto Samambaia)

O Departamento de Estradas de Rodagem do Distrito Federal (DER-DF) informa que nesta terça-feira (5/7) a alça de acesso a Samambaia, localizada no trecho da fábrica da Coca-Cola (Viaduto Samambaia), na Estrada Parque do Contro (EPCT), será fechada para aplicação de microrrevestimento asfáltico a frio.

A restrição de tráfego vai ocorrer das 5h da manhã até o meio-dia e se faz necessária para que haja a cura total do asfalto aplicado.

Confira na imagem abaixo o trecho que será fechado, destacado na cor azul.

Exit mobile version